Interstate 45 is Houston’s north-south interstate. Its busiest Harris County count station averaged 271,938 vehicles a day in 2025.1 Construction on the Texas Department of Transportation’s (TxDOT) North Houston Highway Improvement Project (NHHIP) began in October 2024.2
North Freeway and Gulf Freeway: I-45’s Houston segments
North of downtown, I-45 is the North Freeway. It meets I-10 near downtown, crosses the 610 North Loop and Beltway 8 North, and continues into Montgomery County toward Conroe. Southeast of downtown it is the Gulf Freeway, which crosses the 610 South Loop and Beltway 8 Southeast on its way to Galveston.3
Around downtown, I-45 runs on the Pierce Elevated along the west and south sides of the central business district. The NHHIP would move I-45 next to I-10 and I-69 and end the Pierce Elevated’s use as a highway.2
I-45 traffic counts
| Freeway section | Location (nearest cross street) | AADT 2025 | AADT 2024 | AADT 2023 |
|---|---|---|---|---|
| I-45 North Fwy | near Resthaven Cemetery | 271,938 | 266,095 | n/a |
| I-45 North Fwy | near Exit 63 | 265,446 | 266,096 | 264,741 |
| I-45 North Fwy | near Exit 64 | 261,101 | 264,796 | 260,595 |
| I-45 Gulf Fwy | near Colgate St | 244,087 | 245,916 | 242,000 |
| I-45 Gulf Fwy | near Exit 32 | 231,469 | 238,104 | 224,891 |
| I-45 Gulf Fwy | near Gulf Central Dr | 216,036 | 217,996 | 206,377 |
The three busiest stations on I-45 in Harris County are all on the North Freeway, near Resthaven Cemetery and exits 63 and 64. From 2024 to 2025 the top station rose 2.2% and the busiest Gulf Freeway station slipped 0.7%, by Texas Mobility Outlook’s arithmetic from TxDOT’s annual average daily traffic (AADT) counts.1

I-45 truck traffic
| Freeway section | Location (nearest cross street) | County | Count date | Trucks (24 hours) | Truck share (%) | Combination trucks |
|---|---|---|---|---|---|---|
| I-45 North Fwy | near Resthaven Cemetery | Harris | April 30, 2025 | 21,275 | 8.08 | 13,131 |
| I-45 North Fwy | near Grand Central Pkwy | Montgomery | March 12, 2024 | 18,698 | 11.05 | 12,531 |
| I-45 North Fwy | near Exit 88 | Montgomery | May 20, 2025 | 15,351 | 13.73 | 11,382 |
| I-45 Gulf Fwy | near Santa Elena St | Harris | April 30, 2025 | 11,537 | 5.59 | 4,647 |
| I-45 Gulf Fwy | near Cedar Dr | Galveston | April 23, 2025 | 2,313 | 5.68 | 1,053 |
TxDOT’s 24-hour classification count on the North Freeway near Resthaven Cemetery found 21,275 trucks among 263,458 vehicles on April 30, 2025, or 8.08%. Tractor-trailers and other combination trucks made up 61.7% of those trucks. On the Gulf Freeway near Santa Elena St the same day, trucks were 5.59% of traffic and combination trucks 40.3% of trucks.4 The shares of trucks are computed by Texas Mobility Outlook.
In Montgomery County, counts found higher truck shares: 11.05% (March 2024) and 13.73% (May 2025).
I-45 congestion rankings
| Rank | Road | Segment | Miles | Delay per mile (person-hours) | Congestion cost | 2024 rank |
|---|---|---|---|---|---|---|
| 7 | I-45 Gulf Fwy | I-10 to I-610 South Loop | 7.89 | 941,563 | $198,265,876 | 14 |
| 19 | I-45 North Fwy | I-610 North Loop to I-10 | 3.13 | 608,126 | $51,015,303 | 22 |
| 21 | I-45 North Fwy | Beltway 8 North to I-610 North Loop | 9.27 | 560,676 | $142,885,967 | 25 |
| 51 | I-45 Gulf Fwy | I-610 South Loop to Beltway 8 Southeast | 8.06 | 287,338 | $61,287,410 | 45 |
| 90 | I-45 North Fwy (Montgomery Co.) | Lake Front Cir to FM 2920 | 6.74 | 183,228 | $35,540,732 | 137 |
The Gulf Freeway from I-10 to the 610 South Loop is I-45’s most congested section in the 2025 ranking by the Texas A&M Transportation Institute (TTI), which uses 2024 traffic. It moved into the statewide top 10 at No. 7, up from No. 14.5 Its $198.3 million congestion cost is the highest of any Houston-area segment on the list, by Texas Mobility Outlook’s reading of TTI’s table.3
For trucks, TTI ranks the same Gulf Freeway section 23rd in Texas, the North Freeway from Beltway 8 to I-610 27th and the North Freeway from I-610 to I-10 41st.3
What the NHHIP will build
TxDOT divides the project into three segments: Beltway 8 North to I-610 (Segment 1), I-610 to I-10 (Segment 2), and a downtown loop system covering I-45, I-10 and US 59/I-69 (Segment 3).6 Its main elements:
- Four non-tolled managed lanes, two in each direction, open around the clock to carpools and transit, from Beltway 8 North to downtown and along US 59/I-69 to Spur 527.
- I-45 rerouted to run parallel to I-10 on the north side of downtown and to US 59/I-69 on the east side.
- Four I-10 express lanes between I-45 and US 59/I-69, and a rebuilt I-45 interchange at the 610 North Loop.6
- On I-69 downtown, “lanes will increase from 8 to 10 or 12 in each direction,” in TxDOT’s words.2
TxDOT says the Pierce Elevated “will no longer serve a transportation function and could be removed or repurposed.”2

NHHIP cost: $9.47 billion, and why TxDOT figures differ
| Project | Segment | Main components (TxDOT wording, abbreviated) | Estimated contract cost |
|---|---|---|---|
| 3A | 3: Downtown loop | Depressed main lanes, cap structures, pedestrian realm | $850,500,000 |
| 3B-1 | 3: Downtown loop | Drainage project for 3B-2 | $121,800,000 |
| 3B-2 | 3: Downtown loop | Depressed main lanes, arch bridges, pedestrian realm | $695,500,000 |
| 3C-1 | 3: Downtown loop | Main lane reconstruction, UPRR crossing | $180,000,000 |
| 3C-2 | 3: Downtown loop | I-69 alignment shift, detention, south canal | $1,740,127,000 |
| 3C-3 | 3: Downtown loop | Bridges, UHD, METRO rail line | $273,200,000 |
| 3C-4 | 3: Downtown loop | Future I-10 express lanes, downtown connections, detention, trails | $973,764,000 |
| 3D-1 | 3: Downtown loop | Depressed main lanes, cap structure, realign I-45 | $1,534,414,000 |
| 3D-2 | 3: Downtown loop | Pierce Elevated | $260,586,000 |
| 2A | 2: I-610 to I-10 | I-45 MaX lanes, cap structure, detention | $682,800,000 |
| 2B | 2: I-610 to I-10 | I-45 MaX lanes, continuous frontage roads through interchange | $1,015,400,000 |
| 1A | 1: Beltway 8 North to I-610 | I-45 MaX lanes, bike and pedestrian facilities along frontage roads, detention | $360,000,000 |
| 1B | 1: Beltway 8 North to I-610 | I-45 MaX lanes, bike and pedestrian facilities along frontage roads, detention | $474,018,000 |
| 1C | 1: Beltway 8 North to I-610 | I-45 MaX lanes, bike and pedestrian facilities along frontage roads, detention | $312,590,000 |
| All 14 projects | Total (computed) | Sum of the estimates above | $9,474,699,000 |
TxDOT’s August 2026 construction phasing graphic lists an estimated contract cost for each of the 14 projects. They add up to $9,474,699,000, Texas Mobility Outlook’s sum.7 Other TxDOT pages give different numbers:
- Segment 1: “$1.15 billion” in the segment page’s text, but “Total cost = $907,200,000” on the same page. The graphic’s three projects sum to $1.147 billion.8
- Segment 2: $1.62 billion on the segment page; $1,698,200,000 on TxDOT’s Texas Clear Lanes page, which matches the graphic.9,10
- Project 3A (I-69, SH 288 to Spur 527): $850.5 million on the graphic, $771.8 million on Texas Clear Lanes, and $742.1 million in a TxDOT Connect project record updated Oct. 2, 2026.7,10,11
- Project 3B-2 (I-69, SH 288 to I-45): $695.5 million on the graphic and Texas Clear Lanes; a TxDOT Connect record last updated in September 2024 lists $549.0 million.11
Texas Mobility Outlook uses the graphic because it is the only TxDOT source that prices all 14 projects at one date.
NHHIP construction schedule
| When | Step |
|---|---|
| 2020 | TxDOT issues the final environmental impact statement |
| 2021 | Record of Decision issued; the Federal Highway Administration (FHWA) pauses the project |
| Dec. 19 and 22, 2022 | Memorandums of understanding with the City of Houston and Harris County |
| 2023 | Voluntary Resolution Agreement with FHWA; project taken off pause |
| Oct. 2024 | Construction begins on 3B-1, a drainage project along St. Emanuel St |
| Jan. 2025 | Construction begins on 3B-2, rebuilding the I-69 main lanes from SH 288 to I-45 |
| Oct. 2027 | Estimated letting for 3A (TxDOT Connect) |
| 2028 or 2031 | Segment 2 construction start: 2028 on the segment page; 2031 on Texas Clear Lanes and the phasing graphic |
| 2032 | Anticipated Segment 1 start; TxDOT says the Segment 1 projects are unfunded and not actively in the detailed design stage |
| 2038 | Last bars on the phasing graphic, including 3D-2, the Pierce Elevated |
Sources: TxDOT project timeline, segment and project pages, and TxDOT Connect.2,7,8,9,11 The graphic’s bar ends are read visually and are approximate. Texas Clear Lanes gives 3B-2 a 2032-2035 timeline, which conflicts with the January 2025 start on the NHHIP site.10
At an April 28, 2026 public meeting, TxDOT proposed changes to 3C-1 on I-10 between Gregg St and Waco St: an outfall channel to Buffalo Bayou and a pump station, needing 1.18 more acres of right of way, with one potential residential displacement.12
I-45 safety data and the “deadliest highway” claim
TxDOT’s published crash tables do not break out I-45. The nearest official figure is the road-class count: 134 people died on Harris County’s interstates in 2025, a total that combines I-45 with every other Interstate highway in the county.13
Results that name I-45 come from third-party analyses of National Highway Traffic Safety Administration (NHTSA) data:
- A law firm’s marketing study ranked I-45 from exit 49B to exit 60A as the deadliest 10-mile highway segment in the U.S., with 142 fatal crashes in 2000-2019.14
- A study commissioned by a bail bond company counted 88 fatal crashes on I-45 in Houston in 2019-2023, first in Texas, as reported by CultureMap Houston.15
- A personal-finance company placed two five-mile I-45 stretches among Texas’ 10 deadliest for 2017-2019, as reported by FOX 26 Houston.16
The claim that I-45 is America’s deadliest highway began with a 2016 ValuePenguin ranking of 2011-2015 data, in which I-45 was second, measured by fatal crashes per 100 miles of road.17 Later articles moved it to first and dropped the years. The research note Is I-45 the deadliest highway in America? traces the statistic, and Houston’s most dangerous highways compares every published ranking.
Work zones on I-45
TxDOT counts work zone crashes by county, not by road. Harris County had 1,525 work zone crashes in 2025 and 14 work zone deaths, up from 10 deaths in 2024.18,19 NHHIP work under way in fall 2026 includes a Chartres St closure from Aug. 3, 2026 to Jan. 31, 2027 and the rebuild of the Alabama St bridge through Feb. 8, 2027.20 Houston highway construction and work zone crashes covers the county figures.
Hazmat rules on I-45
A City of Houston ordinance dated March 4, 1970 prohibits non-radioactive hazardous materials on I-45 from Franklin St to US 59, and the 610 Loop is the city’s designated through route.21 The Houston Police Department describes the Pierce Elevated as a restricted hazmat route.22
Outside Houston, TxDOT’s route records list I-45 as a designated through route in Conroe, League City and La Marque. In Galveston, parts of I-45 are a through route, but hazmat is prohibited on I-45 from SH 342 to the west city limits during a 30-hour hurricane warning.21 The NHHIP’s cost by project is tracked with other corridors on Houston highway projects.
Sources
Figures were read from the documents below and checked by Texas Mobility Outlook. Links go to the original publisher. Accessed October 2026 unless noted.
- TxDOT Transportation Planning and Programming Division, TxDOT Annual Average Daily Traffic Counts (Public View), June 29, 2026. AADT 2023-2025 by count station. Station locations from TxDOT coordinates.
- TxDOT, NHHIP Segment 3.
- Texas A&M Transportation Institute (TTI), 2025 Texas 100 Most Congested Road Segments (all vehicles and trucks), November 24, 2025. Rankings reflect calendar year 2024 traffic data.
- TxDOT Transportation Planning and Programming Division, TxDOT 24-hour Truck Volume and Percent, May 14, 2026. Raw single-day classification counts, not adjusted to annual averages.
- TTI, 2025 Texas Top 100 Congested Road Segments (report), November 24, 2025.
- TxDOT, About the North Houston Highway Improvement Project.
- TxDOT Houston District, NHHIP project timelines and construction phasing graphic, August 12, 2026.
- TxDOT, NHHIP Segment 1.
- TxDOT, NHHIP Segment 2.
- TxDOT, Texas Clear Lanes: Houston projects.
- TxDOT, TxDOT Projects Info All (TxDOT Connect extract), September 22, 2026. Project records carry their own last-updated dates.
- TxDOT, I-45 NHHIP public meeting, April 28, 2026, April 13, 2026.
- TxDOT, Fatal Crashes and Fatalities by County and Road Type, 2025. Harris County row, combined rural and urban section.
- Elk & Elk with 1Point21 Interactive, The Deadliest Highways in the United States, March 1, 2023. Commercial or law-firm analysis.Law-firm marketing study using NHTSA FARS, 2000-2019.
- CultureMap Houston, Harris County roads among deadliest in America, June 12, 2025. News report.Reports a study commissioned by a bail bond company; original study not reviewed.
- FOX 26 Houston, Houston area has 3 of 10 most deadly road segments in Texas: study, June 30, 2021. News report.Reports a MoneyGeek analysis; original study not reviewed.
- ValuePenguin, The 50 Most Dangerous Roads in America (2016 edition, archived), October 4, 2016. Commercial or law-firm analysis.Personal-finance publisher. Analysis of NHTSA FARS fatal crashes, 2011-2015.
- TxDOT, Work Zone Crashes and Injuries by County, 2025.
- TxDOT, Work Zone Crashes and Injuries by County, 2024.
- TxDOT, NHHIP construction updates.
- TxDOT, Non-Radioactive Hazardous Materials Routes (map layer), August 13, 2025.
- Houston Police Department, Truck Enforcement Unit: HAZ-MAT.
Data sources for tables and charts
- TxDOT, Top 100 Congested Roadways (map layer), November 24, 2025.